WEST ANGLIA CONNECTION NODE B 400KV SUBSTATION: grid connection queue

WEST ANGLIA CONNECTION NODE B 400KV SUBSTATION · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 1,250 MW are waiting to connect here (largest by capacity: solar + storage, battery storage). Contracted dates run from 30 Oct 2032 to 31 Oct 2034.

2projects in the queue
1,250 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Wymondley FarmWymondley 10 Renewables LtdSolar + storage1,00030 Oct 2032Low30 Oct 2032Scopingnone
Ashbrook Lane BESSDowning Renewable Developments LLPBattery storage25031 Oct 2034Low31 Oct 2034Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Ashbrook Lane BESS31 Oct 203131 Oct 2034+36 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Hilton Primary 11kVUK Power Networks0.7 km1.7 MW1.7 MW
Cotton Primary 11kVUK Power Networks4.3 km4.7 MW4.2 MW
Offord Primary 11kVUK Power Networks7.2 km11 MW9.3 MW
Bourn Primary 11kVUK Power Networks7.5 km17 MW9.6 MW
Godmanchester Primary 11kVUK Power Networks8.1 km2.8 MW4.2 MW
St Ives Primary 11kVUK Power Networks9.2 km12 MW12 MW

Thinking of connecting near WEST ANGLIA CONNECTION NODE B 400KV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points