West Anglia Connection Node A 400kV: grid connection queue

West Anglia Connection Node A 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 1,600 MW are waiting to connect here (largest by capacity: solar, solar + storage). Contracted dates run from 31 Oct 2034 to 31 Oct 2034.

2projects in the queue
1,600 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Leighton BuzzardLeighton Buzzard 10 Renewables LimitedSolar1,00031 Oct 2034Low31 Oct 2034Scoping1
DunstableConnectid 9 LimitedSolar + storage60031 Oct 2034Low31 Oct 2034Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
St Ives Primary 11kVUK Power Networks1.7 km12 MW12 MW
Godmanchester Primary 11kVUK Power Networks5.9 km2.8 MW4.2 MW
Huntingdon Grid 11kVUK Power Networks6.3 km105 MW25 MW
Huntingdon Grid 33kVUK Power Networks6.3 km62 MW51 MW
Hilton Primary 11kVUK Power Networks7.7 km1.7 MW1.7 MW
Cotton Primary 11kVUK Power Networks9.7 km4.7 MW4.2 MW

Thinking of connecting near West Anglia Connection Node A 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points