Tealing IDNO 132/33kV: grid connection queue

Tealing IDNO 132/33kV GSP · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 80 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 31 Oct 2028 to 31 Oct 2028.

1project in the queue
80 MWwaiting to connect
0 MWalready connected
80 MWholding Gate 2
1date moves since 2 Jun 2026
80 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Tealing Solar & StorageSIRIUS ECODEV (TEALING) LTDSolar + storage8031 Oct 2028High31 Oct 2030Awaiting Consents2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
27 Oct 2026Tealing Solar & Storage31 Oct 202731 Oct 2028+12 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Longhaugh PrimarySSEN Distribution4.8 km0 MW7.5 MW
West Kirkton PrimarySSEN Distribution4.9 km0 MW0 MW
Leoch PrimarySSEN Distribution5.5 km0 MW4 MW
MacAlpine Road PrimarySSEN Distribution5.6 km0 MW0 MW
Old Craigie Road PrimarySSEN Distribution6.3 km0 MW6.9 MW
Milton of Craigie GSPSSEN Distribution6.8 km

Thinking of connecting near Tealing IDNO 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.