Tealing 132kV: grid connection queue

Tealing 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

2 projects with 700 MW are waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2028 to 31 Oct 2033.

2projects in the queue
700 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
200 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Myreton BESSGPC 1039 LtdBattery storage20031 Oct 2028High31 Oct 2030Scopingnone
South Powrie FarmQAIR RENEWABLES UK LIMITEDBattery storage50031 Oct 2033Low31 Oct 2033Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Longhaugh PrimarySSEN Distribution4.8 km0 MW7.5 MW
West Kirkton PrimarySSEN Distribution4.9 km0 MW0 MW
Leoch PrimarySSEN Distribution5.5 km0 MW4 MW
MacAlpine Road PrimarySSEN Distribution5.6 km0 MW0 MW
Old Craigie Road PrimarySSEN Distribution6.3 km0 MW6.9 MW
Milton of Craigie GSPSSEN Distribution6.8 km

Thinking of connecting near Tealing 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.