Taynuilt 132/33kV GSP: grid connection queue

Taynuilt 132/33kV GSP Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 35 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 28 Mar 2031 to 28 Mar 2031.

1project in the queue
35 MWwaiting to connect
0 MWalready connected
35 MWholding Gate 2
1date moves since 2 Jun 2026
35 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Beinn GhlasHEADWIND DEVELOPMENT SERVICES LIMITEDOnshore wind3528 Mar 2031High11 Feb 2033Consents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 0 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
10 Nov 2026Beinn Ghlas31 Oct 203428 Mar 2031-43 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Lochdonhead PrimarySSEN Distribution2.2 km0 MW0 MW
Kerrera PrimarySSEN Distribution11.2 km0 MW0 MW
Fishnish PrimarySSEN Distribution11.4 km0.2 MW0.2 MW
Lochaline PrimarySSEN Distribution13.9 km0.7 MW4.2 MW
Oban PrimarySSEN Distribution14.0 km0 MW0 MW
Kilninver PrimarySSEN Distribution14.9 km0 MW0.9 MW

Thinking of connecting near Taynuilt 132/33kV GSP?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.