Craig Murrail: grid connection queue

Craig Murrail GSP · SSEN Transmission (northern Scotland) · register of 26 November 2026

2 projects with 56 MW are waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2034 to 31 Oct 2037.

2projects in the queue
56 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
High Brenfield 2High Brenfield Wind Farm LimitedOnshore wind2031 Oct 2034Low31 Oct 2034Scoping1
GlasvaarE Power LimitedOnshore wind3631 Oct 2037Low31 Oct 2037Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Fishnish PrimarySSEN Distribution7.2 km0.2 MW0.2 MW
Salen, Acharacle PrimarySSEN Distribution8.0 km0 MW0 MW
Lochaline PrimarySSEN Distribution10.6 km0.7 MW4.2 MW
Lochdonhead PrimarySSEN Distribution11.0 km0 MW0 MW
Kinloch PrimarySSEN Distribution13.4 km0 MW0 MW
Rahoy PrimarySSEN Distribution14.7 km0.7 MW1.2 MW

Thinking of connecting near Craig Murrail?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.