NEW TAYNUILT 132 KV SUBSTATION: grid connection queue

NEW TAYNUILT 132 KV SUBSTATION · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 290 MW is waiting to connect here (largest by capacity: mixed and other). Contracted dates run from 31 Oct 2037 to 31 Oct 2037.

1project in the queue
290 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Beinn DeargGALILEO 19 LIMITEDMixed and other29031 Oct 2037Low31 Oct 2037Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Beinn Dearg31 Oct 203131 Oct 2037+72 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Lochdonhead PrimarySSEN Distribution2.2 km0 MW0 MW
Kerrera PrimarySSEN Distribution11.2 km0 MW0 MW
Fishnish PrimarySSEN Distribution11.4 km0.2 MW0.2 MW
Lochaline PrimarySSEN Distribution13.9 km0.7 MW4.2 MW
Oban PrimarySSEN Distribution14.0 km0 MW0 MW
Kilninver PrimarySSEN Distribution14.9 km0 MW0.9 MW

Thinking of connecting near NEW TAYNUILT 132 KV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points