South Kyle 2 132/33kV: grid connection queue

South Kyle 2 132/33kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 92 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 31 Jul 2030 to 31 Jul 2030.

1project in the queue
92 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
92 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
South Kyle 2 Wind farmVATTENFALL WIND POWER LTDOnshore wind + storage9231 Jul 2030High16 Jun 2032Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Mill StreetSP Energy Networks0.2 km25 MW6.3 MW
Old Bridge RoadSP Energy Networks2.9 km15 MW
GlengallSP Energy Networks3.1 km24 MW9 MW
MonktonSP Energy Networks6.7 km25 MW6.1 MW
DrumleySP Energy Networks8.1 km11 MW4.7 MW
TroonSP Energy Networks9.9 km24 MW3.1 MW

Thinking of connecting near South Kyle 2 132/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.