Ayr 275/33kV: grid connection queue

Ayr 275/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

2 projects with 400 MW are waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2030 to 30 Oct 2037.

2projects in the queue
400 MWwaiting to connect
50 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Clonmacate Farm BESSGPC Project 11 LtdBattery storage20031 Oct 2030Medium31 Oct 2030Scopingnone
FPE Ayr BESSFUTURE POWER ENTERPRISES LTDBattery storage20030 Oct 2037Low30 Oct 2037Scopingnone

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
7 Jul 2026Holmston Farm Battery Energy Storage System30 Jun 202531 Jul 2026+13 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Old Bridge RoadSP Energy Networks2.1 km15 MW
Mill StreetSP Energy Networks2.4 km25 MW6.3 MW
GlengallSP Energy Networks3.1 km24 MW9 MW
DrumleySP Energy Networks6.2 km11 MW4.7 MW
MonktonSP Energy Networks6.6 km25 MW6.1 MW
TroonSP Energy Networks10.7 km24 MW3.1 MW

Thinking of connecting near Ayr 275/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.