South Anglia Connection Node D 132kV: grid connection queue

South Anglia Connection Node D 132kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 400 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2034 to 31 Oct 2034.

1project in the queue
400 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Church Road FarmQAIR RENEWABLES UK LIMITEDBattery storage40031 Oct 2034Low31 Oct 2034Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Marks Tey Primary 11kVUK Power Networks8.1 km14 MW5.2 MW
Cornard Primary 11kVUK Power Networks8.8 km8.1 MW9.5 MW
Lexden Primary 11kVUK Power Networks8.9 km22 MW6.9 MW
Halstead Primary 11kVUK Power Networks9.4 km16 MW0.7 MW
Braiswick Primary 11kVUK Power Networks9.5 km16 MW8 MW
Severalls Ln Primary 11kVUK Power Networks10.5 km21 MW7.8 MW

Thinking of connecting near South Anglia Connection Node D 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points