South Anglia Connection Node D 132kV: grid connection queue
South Anglia Connection Node D 132kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 400 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2034 to 31 Oct 2034.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Church Road Farm | QAIR RENEWABLES UK LIMITED | Battery storage | 400 | 31 Oct 2034 | Low | 31 Oct 2034 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Marks Tey Primary 11kV | UK Power Networks | 8.1 km | 14 MW | 5.2 MW |
| Cornard Primary 11kV | UK Power Networks | 8.8 km | 8.1 MW | 9.5 MW |
| Lexden Primary 11kV | UK Power Networks | 8.9 km | 22 MW | 6.9 MW |
| Halstead Primary 11kV | UK Power Networks | 9.4 km | 16 MW | 0.7 MW |
| Braiswick Primary 11kV | UK Power Networks | 9.5 km | 16 MW | 8 MW |
| Severalls Ln Primary 11kV | UK Power Networks | 10.5 km | 21 MW | 7.8 MW |
Thinking of connecting near South Anglia Connection Node D 132kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- South Anglia Connection Node A 400kV: 1,240 MW waiting
- South Anglia Connection Node B 400kV: 1,420 MW waiting
- South Anglia Connection Node E 400kV: 1,509 MW waiting
- Braintree 400kV: 1,107 MW waiting
- South Anglia Connection Node D 400kV: 1,000 MW waiting