Benzene

South Anglia Connection Node A 400kV: grid connection queue

South Anglia Connection Node A 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 1,240 MW are waiting to connect here (largest by capacity: battery storage, solar + storage). Contracted dates run from 30 Oct 2034 to 31 Oct 2034.

2projects in the queue
1,240 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Lightsource Bramford PV & BESSLightsource Renewable UK Development LimitedSolar + storage24030 Oct 2034Low30 Oct 2034Scoping1
Alcemi Bramford Battery Energy Storage Facility Phase 2ALCEMI STORAGE DEVELOPMENTS 1 LIMITEDBattery storage1,00031 Oct 2034Low31 Oct 2034Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Marks Tey Primary 11kVUK Power Networks2.7 km14 MW5.2 MW
Coggeshall Primary 11kVUK Power Networks3.8 km14 MW6.1 MW
Tiptree Primary 11kVUK Power Networks6.9 km14 MW0.4 MW
Lexden Primary 11kVUK Power Networks8.7 km22 MW6.9 MW
Shrub End Primary 11kVUK Power Networks9.2 km9.8 MW7.9 MW
Witham Primary 11kVUK Power Networks10.0 km20 MW17 MW

Thinking of connecting near South Anglia Connection Node A 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points