South Anglia Connection Node D 400kV: grid connection queue

South Anglia Connection Node D 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 1,000 MW are waiting to connect here (largest by capacity: solar + storage, mixed and other). Contracted dates run from 31 Oct 2030 to 31 Oct 2037.

2projects in the queue
1,000 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
SunnicaSUNNICA LIMITEDSolar + storage50031 Oct 2030Medium31 Oct 2030Consents Approvednone
Cambridgeshire Energy Storage CentreHydrostor UK LtdMixed and other50031 Oct 2037Low31 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Witham Primary 11kVUK Power Networks2.9 km20 MW17 MW
South Witham Primary 11kVUK Power Networks3.6 km21 MW9.7 MW
Tiptree Primary 11kVUK Power Networks4.8 km14 MW0.4 MW
Maldon Causeway Primary 11kVUK Power Networks6.8 km23 MW11 MW
Coggeshall Primary 11kVUK Power Networks7.0 km14 MW6.1 MW
Maldon Grid 33kVUK Power Networks8.4 km62 MW25 MW

Thinking of connecting near South Anglia Connection Node D 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.