Shrewsbury 400kV: grid connection queue

Shrewsbury 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 431 MW is waiting to connect here (largest by capacity: solar). Contracted dates run from 30 Oct 2037 to 30 Oct 2037.

1project in the queue
431 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Kenwick SolarANESCO LIMITEDSolar43130 Oct 2037Low30 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Shawbury T1SP Energy Networks11.4 km1.7 MW
Baschurch T1SP Energy Networks12.9 km0.1 MW1 MW
Express Foods T1SP Energy Networks14.2 km6 MW
Wem T1SP Energy Networks17.3 km3 MW
Wem East T1SP Energy Networks17.3 km4.3 MW

Thinking of connecting near Shrewsbury 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points