SHAWFAIR 400KV SUBSTATION: grid connection queue
SHAWFAIR 400KV SUBSTATION · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 240 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 30 Apr 2034 to 30 Apr 2034.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Burdiehouse BESS | IBV Burdiehouse Energy Park Limited | Battery storage | 240 | 30 Apr 2034 | Low | 30 Apr 2034 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Lugton | SP Energy Networks | 2.0 km | 6.8 MW | |
| Little France | SP Energy Networks | 2.6 km | 27 MW | 14 MW |
| Niddrie | SP Energy Networks | 2.9 km | 10 MW | 9.4 MW |
| Poltonhall | SP Energy Networks | 3.6 km | 10 MW | 3 MW |
| Monktonhall | SP Energy Networks | 3.7 km | 27 MW | 8.8 MW |
| Frogston Road East | SP Energy Networks | 4.3 km | 14 MW | 14 MW |
Thinking of connecting near SHAWFAIR 400KV SUBSTATION?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Dalkeith 400kV: 600 MW waiting
- Dunlaw Extension 132/33kV: 53 MW waiting
- Whitehouse 275kV: 249 MW waiting
- Meadowmill 400/132kV: 342 MW waiting
- Currie 275/132kV: 150 MW waiting