ROWANCRAIG WIND FARM 33KV SUBSTATION: grid connection queue

ROWANCRAIG WIND FARM 33KV SUBSTATION · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 40 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 May 2030 to 31 May 2030.

1project in the queue
40 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
40 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Rowancraig Wind FarmKoehler Renewable Energy UK LimitedOnshore wind4031 May 2030High16 Apr 2032Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Rowancraig Wind Farm30 Oct 202831 May 2030+19 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
FauldheadSP Energy Networks4.8 km9.4 MW5.7 MW
New CumnockSP Energy Networks14.0 km-67 MW7.8 MW
PenpontSP Energy Networks18.1 km3.5 MW
CronberrySP Energy Networks19.8 km7.9 MW7.3 MW

Thinking of connecting near ROWANCRAIG WIND FARM 33KV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points