Northfleet East 400kV: grid connection queue

Northfleet East 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 50 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 30 Jun 2028 to 30 Jun 2028.

1project in the queue
50 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
50 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
NorthFleet TertiaryCSE29 LIMITEDSolar + storage5030 Jun 2028High30 Jun 2030Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
North Sevenoaks 11kVUK Power Networks3.7 km47 MW25 MW
Sundridge 11kVUK Power Networks6.3 km23 MW6.7 MW
Tonbridge Town 6.6kVUK Power Networks8.0 km22 MW8.6 MW
Tonbridge East 6.6kVUK Power Networks8.1 km13 MW6.3 MW
Four Elms 11kVUK Power Networks8.4 km7.6 MW4.3 MW
Wrotham Heath 11kVUK Power Networks9.5 km1.5 MW1.7 MW

Thinking of connecting near Northfleet East 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points