NorthFleet 400kV: grid connection queue
NorthFleet 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 300 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2028 to 31 Oct 2028.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| NorthFleet 2 BESS | CSE41 LIMITED | Battery storage | 300 | 31 Oct 2028 | High | 31 Oct 2030 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Rosherville 6.6kV | UK Power Networks | 1.1 km | 19 MW | 4.4 MW |
| Ebbsfleet 11KV | UK Power Networks | 1.4 km | 35 MW | 21 MW |
| Gravesend West 11kV | UK Power Networks | 1.5 km | 18 MW | 9.3 MW |
| Northfleet East 33kV | UK Power Networks | 1.9 km | 209 MW | 95 MW |
| Selwyn Rd Primary 11kV | UK Power Networks | 2.4 km | 17 MW | -0.3 MW |
| Swanscombe 11kV | UK Power Networks | 2.7 km | 14 MW | 5.6 MW |
Thinking of connecting near NorthFleet 400kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Littlebrook 132kV: 550 MW waiting
- Littlebrook 400kV: 57 MW waiting
- Kingsnorth 400kV: 2,850 MW waiting
- KINGSNORTH B 400KV SUBSTATION: 400 MW waiting
- Kingsnorth 132kV: 180 MW waiting