Newton Stewart: grid connection queue

Newton Stewart GSP · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 73 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2036 to 31 Oct 2036.

1project in the queue
73 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
KillealABEI ENERGY LIMITEDOnshore wind7331 Oct 2036Low31 Oct 2036Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Newton StewartSP Energy Networks1.1 km26 MW3.6 MW
CreetownSP Energy Networks7.8 km7.8 MW8.7 MW
SorbieSP Energy Networks17.6 km8.8 MW4.7 MW
GatehouseSP Energy Networks19.8 km7.9 MW5.4 MW

Thinking of connecting near Newton Stewart?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points