New Dunoon 132/33kV GSP: grid connection queue
New Dunoon 132/33kV GSP Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 44 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 May 2030 to 31 May 2030.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Giants Burn Wind Farm | GB WIND FARM LIMITED | Onshore wind | 44 | 31 May 2030 | High | 16 Apr 2032 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Colintraive Primary | SSEN Distribution | 3.3 km | 0 MW | 0.5 MW |
| Sandbank Primary | SSEN Distribution | 10.5 km | 0 MW | 4.1 MW |
| Dunoon GSP | SSEN Distribution | 10.6 km | ||
| Innellan Primary | SSEN Distribution | 10.7 km | 0 MW | 0 MW |
| Kames Primary | SSEN Distribution | 11.1 km | 0 MW | 1.8 MW |
| Dunoon Primary | SSEN Distribution | 11.1 km | 0 MW | 0 MW |
Thinking of connecting near New Dunoon 132/33kV GSP?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Earraghail 275/33KV: 105 MW waiting
- Helensburgh 132/33kV: 40 MW waiting
- Devol Moor 400/132kV: 400 MW waiting
- DEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATION: 49 MW waiting
- Hunterston 400/132kV: 325 MW waiting