DEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATION: grid connection queue
DEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATION · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 49 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2026 to 31 Oct 2026.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Dougliehill BESS | Bluestone Energy Ltd | Battery storage | 49 | 31 Oct 2026 | n/a | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Boundary Street | SP Energy Networks | 0.5 km | 26 MW | 14 MW |
| Baker Street | SP Energy Networks | 2.3 km | 27 MW | 13 MW |
| Port Glasgow | SP Energy Networks | 3.2 km | 20 MW | 6.6 MW |
| Caddlehill | SP Energy Networks | 3.8 km | 12 MW | |
| Inverkip Road | SP Energy Networks | 7.2 km | 22 MW | 17 MW |
| Craigendoran | SP Energy Networks | 7.3 km | 27 MW | 13 MW |
Thinking of connecting near DEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATION?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Devol Moor 400/132kV: 400 MW waiting
- Greenock Road 275kV: 250 MW waiting
- Helensburgh 132/33kV: 40 MW waiting
- Vale of Leven 132kV substation: 72 MW waiting
- Linwood 400kV: 400 MW waiting