Earraghail 275/33KV: grid connection queue

Earraghail 275/33KV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 105 MW is waiting to connect here (largest by capacity: mixed and other). Contracted dates run from 1 Apr 2031 to 1 Apr 2031.

1project in the queue
105 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Earraghail Renewable Energy Development (formerly Skipness & Corranbuie)ScottishPower Renewables (UK) LimitedMixed and other1051 Apr 2031Medium1 Apr 2031Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Tarbert, Loch Fyne PrimarySSEN Distribution5.8 km0 MW0 MW
Claonaig PrimarySSEN Distribution7.0 km0 MW0.3 MW
Stonefield PrimarySSEN Distribution10.4 km0 MW0 MW
Kames PrimarySSEN Distribution11.1 km0 MW1.8 MW
Airigh-Na-Brodaig PrimarySSEN Distribution11.8 km0 MW0 MW
Inverneil PrimarySSEN Distribution17.7 km0 MW0 MW

Thinking of connecting near Earraghail 275/33KV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.