DEUCHERAN HILL 2 132KV SUBSTATION: grid connection queue

DEUCHERAN HILL 2 132KV SUBSTATION · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 165 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 31 Oct 2034 to 31 Oct 2034.

1project in the queue
165 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
2date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Deucheran Hill 2 Wind FarmRWE Renewables UK Onshore Wind LimitedOnshore wind + storage16531 Oct 2034Low31 Oct 2034Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 2 times: 1 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
20 Oct 2026Deucheran Hill 2 Wind Farm1 Apr 203131 Oct 2034+43 months
13 Oct 2026Deucheran Hill 2 Wind Farm31 Oct 20341 Apr 2031-43 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Carradale 2 GSPSSEN Distribution5.1 km
Carradale 1 GSPSSEN Distribution5.1 km
Dippen PrimarySSEN Distribution6.2 km0 MW0.7 MW
Ballure PrimarySSEN Distribution8.9 km0 MW1.6 MW
Balliekine PrimarySSEN Distribution11.0 km0 MW0 MW
Machrie PrimarySSEN Distribution16.0 km0 MW0 MW

Thinking of connecting near DEUCHERAN HILL 2 132KV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report