NEW CARRADALE 132KV SUBSTATION: grid connection queue
NEW CARRADALE 132KV SUBSTATION · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 160 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2037 to 31 Oct 2037.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Tioram Wind Farm | Invenergy Development UK Ltd | Onshore wind | 160 | 31 Oct 2037 | Low | 31 Oct 2037 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Dippen Primary | SSEN Distribution | 3.6 km | 0 MW | 0.7 MW |
| Carradale 1 GSP | SSEN Distribution | 4.7 km | ||
| Carradale 2 GSP | SSEN Distribution | 4.7 km | ||
| Balliekine Primary | SSEN Distribution | 7.4 km | 0 MW | 0 MW |
| Machrie Primary | SSEN Distribution | 8.7 km | 0 MW | 0 MW |
| Campbeltown Primary | SSEN Distribution | 16.7 km | 0 MW | 8.3 MW |
Thinking of connecting near NEW CARRADALE 132KV SUBSTATION?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- CARRADALE 3 132/33KV GRID SUPPLY POINT SUBSTATION: 125 MW waiting
- Carradale 1: 73 MW waiting
- Carradale 2 132/33kV GSP: 50 MW waiting
- Beinn an Tuirc: 95 MW waiting
- DEUCHERAN HILL 2 132KV SUBSTATION: 165 MW waiting