Carradale 2 132/33kV GSP: grid connection queue

Carradale 2 132/33kV GSP Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 50 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 May 2028 to 31 May 2028.

1project in the queue
50 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
50 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
West TorrisdaleESB ASSET DEVELOPMENT UK LIMITEDOnshore wind5031 May 2028High29 Jul 2030Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Dippen PrimarySSEN Distribution3.6 km0 MW0.7 MW
Carradale 1 GSPSSEN Distribution4.7 km
Carradale 2 GSPSSEN Distribution4.7 km
Balliekine PrimarySSEN Distribution7.4 km0 MW0 MW
Machrie PrimarySSEN Distribution8.7 km0 MW0 MW
Campbeltown PrimarySSEN Distribution16.7 km0 MW8.3 MW

Thinking of connecting near Carradale 2 132/33kV GSP?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points