Mid Moile Wind Farm 275/132kV Substatio: grid connection queue

Mid Moile Wind Farm 275/132kV Substatio · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 99 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2031 to 31 Oct 2031.

1project in the queue
99 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
99 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Mid Moile Wind FarmENERGIEKONTOR UK LTDOnshore wind9931 Oct 2031High16 Sep 2033Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
AuchneelSP Energy Networks8.8 km25 MW3.2 MW
StranraerSP Energy Networks9.8 km27 MW1.9 MW
GlenluceSP Energy Networks18.3 km8 MW5.3 MW

Thinking of connecting near Mid Moile Wind Farm 275/132kV Substatio?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points