MERSEYSIDE CONNECTION NODE A 400KV SUBSTATION: grid connection queue

MERSEYSIDE CONNECTION NODE A 400KV SUBSTATION · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 1,260 MW are waiting to connect here (largest by capacity: gas and thermal, battery storage). Contracted dates run from 30 Oct 2037 to 1 Nov 2037.

2projects in the queue
1,260 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Shotwick BESSShotwick Land LimitedBattery storage35030 Oct 2037Low30 Oct 2037Scoping1
Protos Power StationKeadby Generation LimitedGas and thermal9101 Nov 2037Low1 Nov 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Knowsley T1SP Energy Networks1.3 km2.1 MW5.5 MW
Marled Hey T1SP Energy Networks1.4 km2.1 MW5.5 MW
Ainsworth Lane T1SP Energy Networks1.5 km13 MW11 MW
Palco T1SP Energy Networks1.6 km13 MW11 MW
Kelco T1SP Energy Networks1.9 km3.2 MW8.2 MW
Croxteth T1SP Energy Networks1.9 km4.9 MW14 MW

Thinking of connecting near MERSEYSIDE CONNECTION NODE A 400KV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.