London North East Connection Node A: grid connection queue
London North East Connection Node A · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 1,000 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 31 Oct 2031 to 31 Oct 2031.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Rye House | RYE HOUSE 10 RENEWABLES LIMITED | Solar + storage | 1,000 | 31 Oct 2031 | Medium | 31 Oct 2031 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Blackhorse Lane 11kV | UK Power Networks | 0.3 km | 39 MW | 14 MW |
| Exeter Rd 11kV | UK Power Networks | 1.8 km | 58 MW | 18 MW |
| Tottenham Grid 33kV | UK Power Networks | 2.4 km | 80 MW | 42 MW |
| Bruce Gv Primary 11kV | UK Power Networks | 2.4 km | 23 MW | 8.6 MW |
| Central Tottenham Primary 11kV | UK Power Networks | 2.4 km | 29 MW | 6.5 MW |
| Tottenham Grid 11kV | UK Power Networks | 2.4 km | 40 MW | 11 MW |
Thinking of connecting near London North East Connection Node A?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Waltham Cross B 400kV: 250 MW waiting
- Waltham Cross 400kV: 200 MW waiting
- London North East Connection Node A 132kv: 200 MW waiting
- London South Connection Node A 132kV: 480 MW waiting
- Mill Hill 275kV: 57 MW waiting