London South Connection Node A 132kV: grid connection queue

London South Connection Node A 132kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

2 projects with 480 MW are waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2037 to 31 Oct 2037.

2projects in the queue
480 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Beddington 1 BESSBluestone Beddington 1 LtdBattery storage24031 Oct 2037Low31 Oct 2037Scoping1
Beddington 2 BESSBluestone Energy LtdBattery storage24031 Oct 2037Low31 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Verney Rd 11kVUK Power Networks0.5 km52 MW9.1 MW
Neckinger 11kVUK Power Networks1.4 km34 MW12 MW
Chadwick Road 33kVUK Power Networks1.7 km105 MW44 MW
Tooley St 11kVUK Power Networks2.5 km44 MW13 MW
Bengeworth Rd 11kVUK Power Networks2.5 km58 MW13 MW
Bengeworth Rd Grid 33kVUK Power Networks2.5 km143 MW40 MW

Thinking of connecting near London South Connection Node A 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points