Mill Hill 275kV: grid connection queue
Mill Hill 275kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 57 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 24 Oct 2025 to 24 Oct 2025.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Mill Hill Tertiary Connection | HB333MIL LTD | Battery storage | 57 | 24 Oct 2025 | n/a | Consents Approved | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Church End Primary 11kV | UK Power Networks | 1.1 km | 20 MW | 4.7 MW |
| Bellevue Primary 11kV | UK Power Networks | 1.7 km | 43 MW | 11 MW |
| Brockenhurst Primary 11kV | UK Power Networks | 2.3 km | 3.5 MW | 8.1 MW |
| East Finchley Primary 11kV | UK Power Networks | 2.5 km | 26 MW | 6.4 MW |
| Colindale Grid 11kV | UK Power Networks | 2.7 km | 104 MW | 28 MW |
| Mill Hill Primary 11kV | UK Power Networks | 3.1 km | 3.2 MW | 8.3 MW |
Thinking of connecting near Mill Hill 275kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- London North West Connection Node A 400kV: 1,000 MW waiting
- Letchmore Heath 132kV: 170 MW waiting
- London North West Connection Node A 132kV: 200 MW waiting
- West London Connection Node B 132kV substation: 360 MW waiting
- London West Connection Node B 400kV: 200 MW waiting