Laleham GSP (SEPD): grid connection queue
Laleham GSP (SEPD) · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 200 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 24 Feb 2031 to 24 Feb 2031.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Sunbury BESS | SUNBURY BESS LTD | Battery storage | 200 | 24 Feb 2031 | Medium | 24 Feb 2031 | Scoping | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Sidney Road Primary | SSEN Distribution | 0.4 km | 0 MW | 8.7 MW |
| East Bedfont Primary | SSEN Distribution | 0.9 km | 0 MW | 0 MW |
| Causeway Primary | SSEN Distribution | 1.4 km | 0 MW | 25 MW |
| Stanwell Primary | SSEN Distribution | 2.3 km | 0 MW | 3.8 MW |
| Laleham GSP | SSEN Distribution | 2.5 km | ||
| Church Road Primary | SSEN Distribution | 2.7 km | 0 MW | 0 MW |
Thinking of connecting near Laleham GSP (SEPD)?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Laleham 132kV: 90 MW waiting
- Iver 275kV: 50 MW waiting
- Slough East 132kV: 200 MW waiting
- Chessington 132kV: 240 MW waiting
- London North West Connection Node B 400kV: 1,000 MW waiting