London North West Connection Node B 400kV: grid connection queue

London North West Connection Node B 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 1,000 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 31 Oct 2038 to 31 Oct 2038.

1project in the queue
1,000 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
West WeybridgeWest Weybridge 10 Renewables LimitedSolar + storage1,00031 Oct 2038Low31 Oct 2038Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Barnes B 6.6kVUK Power Networks1.5 km36 MW15 MW
Carslake Rd 11kVUK Power Networks2.3 km56 MW19 MW
Richmond 11kVUK Power Networks2.9 km43 MW12 MW
Harvard lane PrimarySSEN Distribution3.6 km29 MW2.7 MW
Fulham Palace Rd C 11kVUK Power Networks4.7 km194 MW67 MW
Wandsworth Central A 11kVUK Power Networks4.8 km35 MW14 MW

Thinking of connecting near London North West Connection Node B 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points