London West Connection Node A 400kV: grid connection queue

London West Connection Node A 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 200 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 Oct 2038 to 31 Oct 2038.

1project in the queue
200 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Tyler Hill IverFRV Powertek LimitedBattery storage20031 Oct 2038Low31 Oct 2038Awaiting Consents1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
South Harrow Primary 11kVUK Power Networks1.0 km19 MW6.5 MW
Sudbury Court Primary 11kVUK Power Networks1.6 km11 MW6.9 MW
Sudbury Primary 11kVUK Power Networks1.6 km25 MW4 MW
Greenford PrimarySSEN Distribution2.1 km70 MW0 MW
Harrow North Grid 33kVUK Power Networks2.6 km70 MW42 MW
Harrow North Grid 11kVUK Power Networks2.7 km40 MW12 MW

Thinking of connecting near London West Connection Node A 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.