Kellas Wind Farm 132kV: grid connection queue

Kellas Wind Farm 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 90 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2030 to 31 Oct 2030.

1project in the queue
90 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
90 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Kellas Wind FarmE Power LimitedOnshore wind9031 Oct 2030High16 Sep 2032Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Dallas GSPSSEN Distribution2.7 km
Bilbohall PrimarySSEN Distribution9.1 km0 MW7 MW
Ashgrove PrimarySSEN Distribution10.3 km0 MW0 MW
Rothes PrimarySSEN Distribution10.6 km0 MW0.5 MW
Cumming Street PrimarySSEN Distribution10.7 km0 MW7.5 MW
Elgin GSPSSEN Distribution12.2 km

Thinking of connecting near Kellas Wind Farm 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points