Glenmuckloch 132kV: grid connection queue

Glenmuckloch 132kV Substation · SP Transmission (southern Scotland) · register of 26 November 2026

3 projects with 668 MW are waiting to connect here (largest by capacity: battery storage, hydro, pumped storage and tidal). Contracted dates run from 18 May 2029 to 31 Oct 2037.

3projects in the queue
668 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Glenmuckloch Pumped StorageGLENMUCKLOCH PUMPED STORAGE HYDRO LIMITEDHydro, pumped storage and tidal21018 May 2029Medium18 May 2029Consents Approvednone
Lagrae Battery StorageLAGRAE BATTERY STORAGE LIMITEDBattery storage40031 Oct 2036Low31 Oct 2036Scoping1
The Drum Wind FarmWIND ESTATE (UK) LIMITEDOnshore wind5831 Oct 2037Low31 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
FauldheadSP Energy Networks7.9 km9.4 MW5.7 MW
CronberrySP Energy Networks8.3 km7.9 MW7.3 MW
New CumnockSP Energy Networks10.0 km-67 MW7.8 MW
CumnockSP Energy Networks11.2 km14 MW
Killoch CollierySP Energy Networks19.3 km27 MW8.3 MW
Douglas WestSP Energy Networks19.6 km22 MW15 MW

Thinking of connecting near Glenmuckloch 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points