Benzene

Friston 400kV: grid connection queue

Friston 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 880 MW is waiting to connect here (largest by capacity: offshore wind). Contracted dates run from 30 Oct 2029 to 30 Oct 2029.

1project in the queue
880 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
East Anglia One NorthEAST ANGLIA ONE NORTH LIMITEDOffshore wind88030 Oct 2029Medium30 Oct 2029Awaiting Consentsnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Leiston Primary 11kVUK Power Networks2.1 km8.6 MW4.1 MW
Benhall Primary 11kVUK Power Networks4.3 km11 MW5.9 MW
Bentwaters Primary 11kVUK Power Networks9.4 km13 MW5.5 MW
Orford Primary 11kVUK Power Networks9.6 km3.5 MW3.1 MW
Hacheston Primary 11kVUK Power Networks10.5 km6.1 MW6.9 MW
Peasenhall Primary 11kVUK Power Networks10.8 km6.3 MW1.1 MW

Thinking of connecting near Friston 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points