Fairburn Extension 132/33kV: grid connection queue
Fairburn Extension 132/33kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 90 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2031 to 31 Oct 2031.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Fairburn Extension Wind Farm | SSE Renewables Services (UK) Limited | Onshore wind | 90 | 31 Oct 2031 | High | 16 Sep 2033 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Orrin GSP | SSEN Distribution | 2.5 km | ||
| Comrie Primary | SSEN Distribution | 4.0 km | 0 MW | 0 MW |
| Marybank Primary | SSEN Distribution | 4.5 km | 0 MW | 0 MW |
| Beauly GSP | SSEN Distribution | 11.1 km | ||
| Muir of Ord Primary | SSEN Distribution | 11.5 km | 0 MW | 0 MW |
| Aigas Primary | SSEN Distribution | 12.1 km | 0 MW | 0 MW |
Thinking of connecting near Fairburn Extension 132/33kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Orrin: 101 MW waiting
- BEAULY 02 BESS 132kV SUBSTATION: 100 MW waiting
- Beauly substation 275KV: 77 MW waiting
- Beauly 132/33 kV GSP: 50 MW waiting
- Carn Fearna Wind Farm 132/33kV: 85 MW waiting