Benzene

Beauly substation 275KV: grid connection queue

Beauly substation 275KV · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 77 MW is waiting to connect here (largest by capacity: onshore wind + storage). Contracted dates run from 30 Oct 2033 to 30 Oct 2033.

1project in the queue
77 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Tarvie Wind FarmKoehler Renewable Energy UK LimitedOnshore wind + storage7730 Oct 2033Low30 Oct 2033Scopingnone

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Orrin GSPSSEN Distribution4.4 km
Marybank PrimarySSEN Distribution5.1 km0 MW0 MW
Comrie PrimarySSEN Distribution6.2 km0 MW0 MW
Beauly GSPSSEN Distribution9.1 km
Aigas PrimarySSEN Distribution9.9 km0 MW0 MW
Muir of Ord PrimarySSEN Distribution10.2 km0 MW0 MW

Thinking of connecting near Beauly substation 275KV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points