Benzene

Beauly 132/33 kV GSP: grid connection queue

Beauly 132/33 kV GSP Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 50 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 31 May 2026 to 31 May 2026.

1project in the queue
50 MWwaiting to connect
0 MWalready connected
50 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Lovat Estate BESSLG-B-50a LimitedBattery storage5031 May 2026n/aConsents Approved2

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Orrin GSPSSEN Distribution4.4 km
Marybank PrimarySSEN Distribution5.1 km0 MW0 MW
Comrie PrimarySSEN Distribution6.2 km0 MW0 MW
Beauly GSPSSEN Distribution9.1 km
Aigas PrimarySSEN Distribution9.9 km0 MW0 MW
Muir of Ord PrimarySSEN Distribution10.2 km0 MW0 MW

Thinking of connecting near Beauly 132/33 kV GSP?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points