Dunvegan 132/33kV Grid Supply Point: grid connection queue

Dunvegan 132/33kV Grid Supply Point Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 25 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 25 Nov 2031 to 25 Nov 2031.

1project in the queue
25 MWwaiting to connect
0 MWalready connected
25 MWholding Gate 2
0date moves since 2 Jun 2026
25 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Gleann EoghainnRenantis UK LimitedOnshore wind2525 Nov 2031High11 Oct 2033Awaiting Consents2

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Dunvegan GSPSSEN Distribution9.1 km
Dunvegan PrimarySSEN Distribution9.1 km0 MW0 MW
Portree PrimarySSEN Distribution11.5 km0 MW0 MW
Drynoch PrimarySSEN Distribution15.6 km0.7 MW0 MW
Lower Ollach PrimarySSEN Distribution17.2 km1 MW0 MW
Uig PrimarySSEN Distribution18.4 km0 MW0 MW

Thinking of connecting near Dunvegan 132/33kV Grid Supply Point?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points