Abhainn Dubh Wind Farm 132kV: grid connection queue

Abhainn Dubh Wind Farm 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026

1 project with 75 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 May 2029 to 31 May 2029.

1project in the queue
75 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
75 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Abhainn Dubh Wind FarmE Power LimitedOnshore wind7531 May 2029High17 Apr 2031Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Shieldaig PrimarySSEN Distribution5.3 km1 MW0 MW
Kalnakil PrimarySSEN Distribution9.1 km1.1 MW0 MW
Kerry Falls PrimarySSEN Distribution16.6 km0 MW1.5 MW
Kishornhill PrimarySSEN Distribution18.7 km0.7 MW0 MW
Lochcarron PrimarySSEN Distribution20.0 km0 MW1.8 MW

Thinking of connecting near Abhainn Dubh Wind Farm 132kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.