Breakish 132kV: grid connection queue
Breakish 132kV Substation · SSEN Transmission (northern Scotland) · register of 26 November 2026
1 project with 100 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 May 2029 to 31 May 2029.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Breakish Windfarm | Asuk Holdco 2 Limited | Onshore wind | 100 | 31 May 2029 | High | 17 Apr 2031 | Scoping | 1 |
Dates that moved
Since 2 Jun 2026, connection dates here moved by a month or more 2 times: 1 later and 1 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.
| Week seen | Project | Was | Now | Change |
|---|---|---|---|---|
| 27 Oct 2026 | Breakish Windfarm | 30 Apr 2034 | 31 May 2029 | -59 months |
| 20 Oct 2026 | Breakish Windfarm | 31 May 2029 | 30 Apr 2034 | +59 months |
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Kyle Primary | SSEN Distribution | 5.9 km | 4.8 MW | 0 MW |
| Nostie Bridge Primary | SSEN Distribution | 8.0 km | 1.2 MW | 0 MW |
| Skulamus Primary | SSEN Distribution | 13.3 km | 1.4 MW | 0 MW |
| Broadford GSP | SSEN Distribution | 16.7 km | ||
| Broadford Primary | SSEN Distribution | 16.7 km | 4.8 MW | 0 MW |
Thinking of connecting near Breakish 132kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Broadford 132kV: 200 MW waiting
- Broadford: 100 MW waiting
- Abhainn Dubh Wind Farm 132kV: 75 MW waiting
- Beinneun Windfarm 2: 144 MW waiting
- Glen Ullinish Extension 132/33kV: 240 MW waiting