Dungeness 400kV: grid connection queue
Dungeness 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
2 projects with 1,000 MW are waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 31 Aug 2031 to 31 Oct 2037.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| BLUE PLANET SOLAR | BLUE PLANET SOLAR LIMITED | Solar + storage | 500 | 31 Aug 2031 | Medium | 31 Aug 2031 | Scoping | none |
| Dungeness Energy Park | SOUTH KENT ENERGY PARK LIMITED | Solar + storage | 500 | 31 Oct 2037 | Low | 31 Oct 2037 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Romney Warren 11kV | UK Power Networks | 9.4 km | 12 MW | 1.7 MW |
| Dymchurch 11kV | UK Power Networks | 13.9 km | 1.8 MW | -0.2 MW |
| Rye 11kV | UK Power Networks | 17.0 km | 4.3 MW | 1.9 MW |
| Ruckinge Grid 33kV | UK Power Networks | 17.6 km | 36 MW | 27 MW |
| Warehorne 11kV | UK Power Networks | 18.8 km | 1.2 MW | 1.2 MW |
| Rye Grid 33kV | UK Power Networks | 18.8 km | 4.3 MW | 7 MW |
Thinking of connecting near Dungeness 400kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Sellindge 400kV: 576 MW waiting
- EAST KENT CONNECTION NODE B 132KV SUBSTATION: 228 MW waiting
- Sussex and Romney Connection Node B 400kV: 1,440 MW waiting
- Sussex and Romney Connection Node B 132kV: 225 MW waiting
- Canterbury North 400kV: 57 MW waiting