Canterbury North 400kV: grid connection queue
Canterbury North 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026
1 project with 57 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 31 Oct 2031 to 31 Oct 2031.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Canterbury Tertiary | ENSO GREEN HOLDINGS L LIMITED | Solar + storage | 57 | 31 Oct 2031 | Medium | 31 Oct 2031 | Awaiting Consents | none |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Chartham 11kV | UK Power Networks | 4.6 km | 10 MW | 5.2 MW |
| Faversham 11kV | UK Power Networks | 6.0 km | 26 MW | 15 MW |
| Canterbury Town 11kV | UK Power Networks | 8.9 km | 27 MW | 6.9 MW |
| Canterbury South 33kV | UK Power Networks | 9.1 km | 118 MW | 67 MW |
| Whitstable 11kV | UK Power Networks | 10.5 km | -40.9 MW | 12 MW |
| Canterbury Local 11kV | UK Power Networks | 10.8 km | 24 MW | 3.5 MW |
Thinking of connecting near Canterbury North 400kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- East Kent connection node A 400kV: 3,520 MW waiting
- EAST KENT CONNECTION NODE B 132KV SUBSTATION: 228 MW waiting
- East Kent Connection Node B 400kV: 1,350 MW waiting
- Kemsley 400kV: 249 MW waiting
- Kemsley: 100 MW waiting