Sussex and Romney Connection Node B 400kV: grid connection queue

Sussex and Romney Connection Node B 400kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

4 projects with 1,440 MW are waiting to connect here (largest by capacity: solar + storage, battery storage). Contracted dates run from 21 Oct 2031 to 31 Oct 2037.

4projects in the queue
1,440 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Shipley Road BESSCSE43 LIMITEDBattery storage40021 Oct 2031Medium21 Oct 2031Consents Approvednone
Lightsource Shipley PVLightsource Renewable UK Development LimitedSolar + storage24030 Oct 2037Low30 Oct 2037Scoping1
SAVE OUR PLANETSAVE OUR PLANET ENERGY LIMITEDSolar + storage50031 Oct 2037Low31 Oct 2037Scoping1
DRAGON GREEN BESSSHAW-ENERGI LTDBattery storage30031 Oct 2037Low31 Oct 2037Scoping1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Bexhill Town 11kVUK Power Networks3.8 km23 MW5.2 MW
Baldslow 11kVUK Power Networks3.8 km12 MW6.8 MW
Ninfield Local 11kVUK Power Networks4.8 km5.3 MW1.5 MW
Ninfield Grid 33kVUK Power Networks4.8 km102 MW36 MW
Little Common 11kVUK Power Networks5.7 km22 MW9.6 MW
Hastings Local 11kVUK Power Networks6.6 km104 MW14 MW

Thinking of connecting near Sussex and Romney Connection Node B 400kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points