DALMARNOCK 132/33KV SUBSTATION: grid connection queue

DALMARNOCK 132/33KV SUBSTATION · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 40 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 23 Feb 2024 to 23 Feb 2024.

1project in the queue
40 MWwaiting to connect
0 MWalready connected
40 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Dalmarnock Road BESSDALMARNOCK BESS LTDBattery storage4023 Feb 2024n/aUnder Construction/Commissioning2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
7 Jul 2026Dalmarnock Road BESS30 Oct 202323 Feb 2024+4 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
Ashgrove StreetSP Energy Networks0.7 km23 MW8 MW
Maukinfauld RoadSP Energy Networks1.1 km20 MW
David StreetSP Energy Networks1.4 km22 MW10 MW
Eckford StreetSP Energy Networks2.1 km20 MW9.9 MW
EastercraigsSP Energy Networks2.3 km23 MW9.4 MW
CambuslangSP Energy Networks2.4 km18 MW

Thinking of connecting near DALMARNOCK 132/33KV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.