Clydesmill 275/33kV: grid connection queue

Clydesmill 275/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

2 projects with 363 MW are waiting to connect here (largest by capacity: battery storage, solar). Contracted dates run from 31 May 2027 to 30 Apr 2033.

2projects in the queue
363 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
63 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
AGS Calderside PV SolarAdvance Grid Solutions LimitedSolar6331 May 2027High14 Jun 2029Scopingnone
Aitkenhead Farm BESSAitkenhead Storage Facility LimitedBattery storage30030 Apr 2033Low30 Apr 2033Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Aitkenhead Farm BESS31 Oct 202830 Apr 2033+54 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
CambuslangSP Energy Networks1.2 km18 MW
Eckford StreetSP Energy Networks1.6 km20 MW9.9 MW
Westburn RoadSP Energy Networks1.7 km26 MW
Maukinfauld RoadSP Energy Networks1.9 km20 MW
WhitlawburnSP Energy Networks2.9 km22 MW
Ashgrove StreetSP Energy Networks3.0 km23 MW8 MW

Thinking of connecting near Clydesmill 275/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.

Nearby connection points