CHALMERSTON WINDFARM 132kV SUBSTATION: grid connection queue

CHALMERSTON WINDFARM 132kV SUBSTATION · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 75 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 31 Oct 2037 to 31 Oct 2037.

1project in the queue
75 MWwaiting to connect
0 MWalready connected
0 MWholding Gate 2
1date moves since 2 Jun 2026
0 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Chalmerston WindfarmBROCKWELL ENERGY LIMITEDOnshore wind7531 Oct 2037Low31 Oct 2037Scoping1

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
13 Oct 2026Chalmerston Windfarm31 Oct 203331 Oct 2037+48 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
LethanhillSP Energy Networks7.7 km25 MW14 MW
New CumnockSP Energy Networks10.3 km-67 MW7.8 MW
Killoch CollierySP Energy Networks11.9 km27 MW8.3 MW
CumnockSP Energy Networks12.9 km14 MW
MauchlineSP Energy Networks17.8 km11 MW4.6 MW
GlengallSP Energy Networks17.8 km24 MW9 MW

Thinking of connecting near CHALMERSTON WINDFARM 132kV SUBSTATION?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.