Wymondley 400/33kV: grid connection queue

Wymondley 400/33kV Substation · National Grid Electricity Transmission (England and Wales) · register of 26 November 2026

1 project with 50 MW is waiting to connect here (largest by capacity: solar + storage). Contracted dates run from 30 May 2027 to 30 May 2027.

1project in the queue
50 MWwaiting to connect
0 MWalready connected
50 MWholding Gate 2
1date moves since 2 Jun 2026
50 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Wymondley Solar FarmAGR SOLAR 4 LIMITEDSolar + storage5030 May 2027High29 May 2029Consents Approved2

Dates that moved

Since 2 Jun 2026, connection dates here moved by a month or more 1 time: 1 later and 0 earlier. An earlier date can mean someone ahead dropped out or the queue was re-ordered.

Week seenProjectWasNowChange
22 Sep 2026Wymondley Solar Farm31 Oct 202530 May 2027+19 months

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
East Letchworth Primary 11kVUK Power Networks4.1 km16 MW2.2 MW
Letchworth Factory 11kVUK Power Networks4.6 km33 MW9.9 MW
Verity Way Primary 11kVUK Power Networks6.4 km22 MW6.3 MW
West Letchworth Primary 11kVUK Power Networks7.4 km12 MW7.1 MW
Letchworth Grid 33kVUK Power Networks7.4 km94 MW19 MW
North Stevenage Primary 11kVUK Power Networks7.9 km23 MW9.7 MW

Thinking of connecting near Wymondley 400/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.