Whitelee Extension 275/33kV: grid connection queue
Whitelee Extension 275/33kV · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 89 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 29 Sep 2027 to 29 Sep 2027.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Airtnoch BESS | TURBINE MARKETING SPV LIMITED | Battery storage | 89 | 29 Sep 2027 | High | 28 Sep 2029 | Awaiting Consents | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Newmilns | SP Energy Networks | 4.0 km | 16 MW | |
| Grassyards | SP Energy Networks | 10.8 km | 11 MW | |
| Queens Drive | SP Energy Networks | 11.6 km | 15 MW | |
| Langlands Street | SP Energy Networks | 12.1 km | 23 MW | 11 MW |
| Kilmarnock Main | SP Energy Networks | 12.2 km | 27 MW | 12 MW |
| Jackton | SP Energy Networks | 13.3 km | 22 MW | 19 MW |
Thinking of connecting near Whitelee Extension 275/33kV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Whitelee 275/33kV: 513 MW waiting
- Boydston 400kV substation: 350 MW waiting
- Giffnock 275/33kV: 40 MW waiting
- Bankend Rig III 132kV Collector: 78 MW waiting
- Kilmarnock South 400kV: 500 MW waiting