Whitelee Extension 275/33kV: grid connection queue

Whitelee Extension 275/33kV · SP Transmission (southern Scotland) · register of 26 November 2026

1 project with 89 MW is waiting to connect here (largest by capacity: battery storage). Contracted dates run from 29 Sep 2027 to 29 Sep 2027.

1project in the queue
89 MWwaiting to connect
206 MWalready connected
0 MWholding Gate 2
0date moves since 2 Jun 2026
89 MWat high date risk

What sits in the queue

Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).

ProjectCustomerTypeMWContracted dateDate riskLikely dateStageGate
Airtnoch BESSTURBINE MARKETING SPV LIMITEDBattery storage8929 Sep 2027High28 Sep 2029Awaiting Consents1

Dates that moved

No connection date here has moved by a month or more since 2 Jun 2026.

Local network capacity nearby

Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.

SubstationOperatorDistanceGeneration headroomDemand headroom
NewmilnsSP Energy Networks4.0 km16 MW
GrassyardsSP Energy Networks10.8 km11 MW
Queens DriveSP Energy Networks11.6 km15 MW
Langlands StreetSP Energy Networks12.1 km23 MW11 MW
Kilmarnock MainSP Energy Networks12.2 km27 MW12 MW
JacktonSP Energy Networks13.3 km22 MW19 MW

Thinking of connecting near Whitelee Extension 275/33kV?

Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.

Ask for a free check See a sample report

Paid screening reports from £1,950. Queue watch alerts you when anything here changes.