Wether Hill 132/33KV: grid connection queue
Wether Hill 132/33KV Substation · SP Transmission (southern Scotland) · register of 26 November 2026
1 project with 66 MW is waiting to connect here (largest by capacity: onshore wind). Contracted dates run from 29 Sep 2031 to 29 Sep 2031.
What sits in the queue
Sorted by contracted date. Register of 26 November 2026. Date risk and likely date come from how similar projects' dates actually moved over the last two years (how we work it out).
| Project | Customer | Type | MW | Contracted date | Date risk | Likely date | Stage | Gate |
|---|---|---|---|---|---|---|---|---|
| Wether Hill | ScottishPower Renewables (UK) Limited | Onshore wind | 66 | 29 Sep 2031 | High | 15 Aug 2033 | Scoping | 1 |
Dates that moved
No connection date here has moved by a month or more since 2 Jun 2026.
Local network capacity nearby
Nearest distribution substations within 20 km, from each operator's published headroom data. Location is approximate. Check the operator's own map before relying on it.
| Substation | Operator | Distance | Generation headroom | Demand headroom |
|---|---|---|---|---|
| Kendoon Hydro | SP Energy Networks | 11.3 km | 31 MW | 27 MW |
| Carsfad Hydro | SP Energy Networks | 12.8 km | 30 MW | 28 MW |
| Earlstoun Hydro | SP Energy Networks | 14.8 km | 16 MW | 12 MW |
| Penpont | SP Energy Networks | 15.1 km | 3.5 MW | |
| Glenlee Hydro | SP Energy Networks | 16.4 km | 30 MW | 28 MW |
| Fauldhead | SP Energy Networks | 18.8 km | 9.4 MW | 5.7 MW |
Thinking of connecting near Wether Hill 132/33KV?
Tell us the site and size. We'll send you what sits ahead of it in the queue, free. It takes a day.
Ask for a free check See a sample reportPaid screening reports from £1,950. Queue watch alerts you when anything here changes.
Nearby connection points
- Shepards Rig 132/33kV: 85 MW waiting
- SPT Margree collector substation: 145 MW waiting
- Margree 132/33kV Collector: 68 MW waiting
- Quantans Hill 132kV: 145 MW waiting
- Divot Hill 132/33 kV: 63 MW waiting